Engineering & OEM Team
We adapt existing platforms to project requirements rather than starting from scratch, which keeps tooling cost low and lead times short. Recent work includes anti-ligature detention bed frames and space-saving designs for high-density worker accommodation.
Standard lead time is 25–30 days after deposit, EXW or DDP, Tianjin Xingang port.